Denver Water's Plan Review Section (303.628.6100) can assist you if:
- You are developing a lot that does not have frontage onto a tappable main
- You are installing or relocating a fire hydrant
- You are developing a parcel with no infrastructure in place
If your project involves any of the above, a set of plans must be submitted to Denver Water for review and approval. If your property is within one of Denver Water's Distributor Contract Areas, the Distributor will also want to review your plans.