Application Procedure for Fire Line Installation
by Pre-Qualified Contractors, Inside Denver/Total Service Areas
(All taps in downtown Denver will be estimated & installed by DW)
Step 1. Engineer Submits:
1. A 24" X 36" drawing to Sales Administration.
- Including Fire Line Construction Notes, Fire Line Detail, Trench Detail, Kick Block Detail, Mega Lug Detail, Length of Restrained Pipe Detail, Meter Notes and Meter Details
- Showing existing valves on main, outdistance of existing main, & distance to next cross street property line
- Showing distance from valves to fire line fitting (for shut-out purposes)