Engineering Standards
Denver Water
Effective 12/01/2004
Disclaimer and Scope of ApplicabilityThe Engineering Standards set forth herein are prepared for and are applicable only in those water service areas served by Denver Water. |
You can download complete Engineering Standards, Materials Specifications, or the Standard Drawings in PDF format. Each document is between 1-3 Megs.
If you wish to obtain an Engineering Standard book with CAD details, they are available at Denver Water, 1600 W. 12th Ave., 3rd Floor Engineering, Denver, CO 80204, from Terri Steele at 303-628-6604. The cost is $100.00.
Attention CAD application users: All CAD files are in AutoCAD 2002 format.
If a CAD drawing does not open after clicking the link, you can save the drawing locally by right-clicking the link and selecting Save target as. All of the CAD drawings on this site use the color/pen width chart here – Specimen C 4-06C – to conform to Denver Water’s standards for plotting.
Section 1 – General |
|
| Title | Section |
Revision |
1-00 |
Authority |
1-01 |
Effective Date of Standards |
1-02 |
Revisions, Amendments or Additions |
1-03 |
Denver Water Control |
1-04 |
Organization and Interpretation of Standards |
1-05 |
Definitions |
1-06 |
Abbreviations |
1-07 |
Section 2 – Main Extensions |
|
| Title | Section |
Inside Denver |
2-01 |
Outside Denver |
2-02 |
Extensions Defined |
2-03 |
Engineering Standards to Apply |
2-04 |
Application Procedure |
2-05 |
Construction Procedure |
2-06 |
Plans & Specifications |
2-07 |
Engineering |
2-08 |
Surveying |
2-09 |
Placing Survey Lines |
2-10 |
Inspection |
2-11 |
Contractors |
2-12 |
Points of Delivery |
2-13 |
Special Conditions |
2-14 |
Exceptions Under Chapter 2 |
2-15 |
Section 3 – Service Lines & Appurtenances |
|
| Title | Section |
General |
3-01 |
Ownership & Maintenance |
3-02 |
Layout |
3-03 |
Separate Trenches |
3-04 |
Combination Service Lines |
3-05 |
Pumps |
3-06 |
Tanks |
3-07 |
Connections for Water |
3-08 |
Taps & Saddles |
3-09 |
Size |
3-10 |
Pipe Material |
3-11 |
Curb Stops, Valves & Valve Boxes |
3-12 |
Meters |
3-13 |
Section 4 – Easements & Licenses |
|
| Title | Section |
General |
4-01 |
Granting an Easement to Denver Water |
4-02 |
Grant an Easement to a Distributor |
4-03 |
Obtaining a License to Use or Cross Denver Water Property |
4-04 |
Acquiring an Easement from Denver Water |
4-05 |
Specimen Sheets Illustrating Procedures |
4-06 |
|
Specimen Illustration Formats >> |
CAD |
|
|
G.Ins. | G. Ins. |
|
4-06A | 4-06A |
|
4-06B | 4-06B |
|
4-06C | 4-06C |
|
4-06D | 4-06D |
|
4-06E | 4-06E |
|
4-06F | 4-06F |
|
4-06G | 4-06G |
|
4-06H | 4-06H |
Section 5 – System Design & Layout |
|
| Title | Section |
General |
5-01 |
Quality of the Distribution System |
5.02 |
Sizing of Distribution Mains |
5-03 |
Fire Protection System |
5-04 |
Operating Pressures within the Distribution System |
5-05 |
Pressure Regulating Stations |
5-06 |
Storage Facilities |
5-07 |
Electric Pump Motors |
5-08 |
Pumping Facilities |
5-09 |
Layout of the Distribution System |
5-10 |
Line Valves |
5-11 |
Connections to Conduits |
5-12 |
Supervisory Control & Data Acquisition (SCADA) |
5-13 |
Interconnects with Other Water Systems |
5-14 |
Flow Measurement |
5-15 |
Section 6 – Materials |
|
| Title | Section |
Materials & Testing |
6-01 |
Size of Mains |
6-02 |
Pipe Classes |
6-03 |
Selection of Pipe |
6-04 |
Pipe Fittings |
6-05 |
Line Valves |
6-06 |
Pressure Regulating Valves |
6-07 |
Tapping Valves & Sleeves |
6-08 |
Check Valves |
6-09 |
Stop & Waste Valves |
6-10 |
Control Of Backflow & Cross Connection |
6-11 |
Valve Boxes |
6-12 |
Valve Reference Marker Posts |
6-13 |
Meters |
6-14 |
Size Of Meter |
6-15 |
Type Of Meter |
6-16 |
Magnetic Drive Displacement Meters |
6-17 |
Compound & Turbine Meters |
6-18 |
Outside Meter Settings |
6-19 |
Inside Meter Settings & Remote Readers |
6-20 |
Meter Bypass Lines |
6-21 |
Meter Check Valves |
6-22 |
Valves For Use With Meters |
6-23 |
Meter Couplings |
6-24 |
Meter Yokes (Line Setters) |
6-25 |
Valve & Meter Supports |
6-26 |
Meter Pits & Covers for 3/4 Inch and One Inch Meters |
6-27 |
Vaults |
6-28 |
Concrete Structures |
6-29 |
Steel Reinforcement For Concrete |
6-30 |
Manholes |
6-31 |
Manhole Base Slabs & Base Beams |
6-32 |
Sump Pits For Vaults & Manholes |
6-33 |
Vent Pipes |
6-34 |
Manufacturer & Model Of Fire Hydrants |
6-35 |
Fireline Connections To Mains |
6-36 |
Service Lines |
6-37 |
Corporation Stops |
6-38 |
Curb Stops |
6-39 |
Curb Stop Service Boxes |
6-40 |
Corrosion Protection Systems |
6-41 |
Kickblocks |
6-42 |
Protective Concrete Pads Over Pipe |
6-43 |
Casing Pipe |
6-44 |
Miscellaneous Metalwork & Piping |
6-45 |
Air & Vacuum Relief Valves |
6-46 |
Section 7 – Earthwork |
|
| Title | Section |
Earthwork Defined |
7-01 |
Exploratory Excavation |
7-02 |
Excavation To Line & Grade |
7-03 |
Trenching Operations |
7-04 |
Excavation For Structures |
7-05 |
Surplus Excavation Material |
7-06 |
Blasting |
7-07 |
Dewatering |
7-08 |
Foundations On Unstable Soil |
7-09 |
Pipe Bedding & Pipe Zone Material |
7-10 |
Backfill & Compaction |
7-11 |
Controlled Low Strength Material (CLSM) |
7-12 |
Cleanup |
7-13 |
Surface Restoration |
7-14 |
Subgrade & Road Preparation |
7-15 |
Section 8 – Pipe Installation |
|
| Title | Section |
Approval By Denver Water |
8-01 |
Handling Of Materials |
8-02 |
Preparation & Inspection Of Pipe & Fittings For Installation |
8-03 |
Pipe Joint Lubricant |
8-04 |
Cutting & Fitting Of Pipe |
8-05 |
Pipe Alignment & Grade |
8-06 |
Deviation From Alignment & Grade Occasioned By Other Structures |
8-07 |
Temporary Bulkheads |
8-08 |
Frost |
8-09 |
Ductile Iron Pipe |
8-10 |
Polyvinyl Chloride Pressure Pipe |
8-11 |
Installation Of Valves |
8-12 |
Installation Of Valve Boxes |
8-13 |
Installation Of Fittings |
8-14 |
Installation Of Tapping Saddles |
8-15 |
Fire Hydrants |
8-16 |
Fireline Connections |
8-17 |
Kickblocks |
8-18 |
Concrete Structures |
8-19 |
Reinforcing Steel For Concrete Structures |
8-20 |
Joint Restraint Devices |
8-21 |
Connections To The Denver Water's System |
8-22 |
Corrosion Protection Systems |
8-23 |
Chlorination |
8-24 |
Hydrostatic Testing |
8-25 |
Acceptance & Release For Taps |
8-26 |
Blow-Off Assembly |
8-27 |
Sewer Crossing |
8-28 |
Section 9 – 16 Inch & 20 Inch Transmission Mains |
|
| Title | Section |
General |
9-01 |
Other Standards To Apply |
9-02 |
Design Of Transmission Mains |
9-03 |
Plans & Specifications |
9-04 |
Material |
9-05 |
Installation |
9-06 |
Sewer Crossings |
9-07 |
Easement Width Requirements |
9-08 |
Section 10 – 24 Inch & Larger Conduits |
|
| Title | Section |
General |
10-01 |
Other Standards To Apply |
10-02 |
Preliminary Investigation |
10-03 |
Design |
10-04 |
Plans & Specifications |
10-05 |
Materials |
10-06 |
Installation |
10-07 |
Sewer Crossings |
10-08 |
As-Constructed Drawings |
10-09 |
Easement Width Requirements |
10-10 |
Section 11 – Non-Potable Water System |
|
| Title | Section |
General |
11-01 |
Other Standards To Apply |
11-02 |
Water Quality |
11-03 |
Potable Water Backup |
11-04 |
Conversion From A Potable To A Recycled Line |
11-05 |
Protection Of The Potable Water System |
11-06 |
Discharges From The System |
11-07 |
User Permits |
11-08 |
Separation From Sewer Lines |
11-09 |
Separation From Potable Water Lines |
11-10 |
Recycled Water Conduits |
11-11 |
Recycled Water Transmission Mains |
11-12 |
Recycled Water Distribution Mains |
11-13 |
Recycled Water Service Lines & Appurtenances |
11-14 |
Nonpotable Customers Guidelines |
11-25 |
Section 12 – Integrated Water System |
|
| Title | Section |
General |
12-01 |
Maintenance Programs |
12-02 |
Distribution System Sampling |
12-03 |
On-Line Water Quality Monitoring |
12-04 |
Water Quality Complaints & Communication |
12-05 |
Facility Operation & Status |
12-06 |
Reporting Compliance |
12-07 |
Materials Specifications |
|
Table of Contents |
ToC |
Standard Drawings |
|
Table of Contents |
ToC |