ID:14010A West Side Complex Administration Building Boiler Replacement
The work to be done, for which bids are invited, shall consist of demolishing existing steam boiler system and hot water system pumps; and furnishing and installing hot water system boilers, pumps, piping, domestic water plate and frame heat exchanger, and controls to run the system.
| Description | MWBE | Invitation to Bid |
Prequalification Form |
Plan List |
Bid Tab |
Addenda | Misc. |
|---|---|---|---|---|---|---|---|
ID:13870A Construction of the Moffat Tunnel Collection System, Vasquez — St. Louis Collection Conduit Siphon No. 1 Replacement STA 5+78 to STA 17+48.76
The work to be done, for which bids are invited, shall consist of installing approximately 1,170 LF of OWNER-furnished 72-inch steel pipe, Grand County, Colorado. The project includes demolition of existing 72-inch steel pipe and appurtenances and installation of new 72-inch steel pipe and appurtenances.
| Description | MWBE | Invitation to Bid |
Prequalification Form |
Plan List |
Bid Tab |
Addenda | Misc. |
|---|---|---|---|---|---|---|---|
Additional Engineering RFPs/SOQs
Request for Statement of Qualifications: Hazeltine Reservoir Slope Improvements
Request for Statement of Qualifications: Platte Canyon Reservoir Spillway Modification