• Pay Bill
  • Customer Support
  • Contact
  • Emergencies
  • Español

Special Fees and Charges

When Denver Water performs a special service for a customer, a charge for that service may be applied to the customer's account. In addition, penalties and fines may be assessed for customer actions that violate our Operating Rules and the License for the property.

If you have any questions about a special charge, a fee, a penalty or a fine that appears on your bill, please call a Customer Care Specialist at 303-893-2444.

Name of Fee Metric Fee Amount
Appointment   $50
Appointment Missed and Rescheduled   $100
Backflow Inspection   $70
Backflow Testing   $160
Backflow Prevention Assembly Compliance   $150
CD or DVD Media Disk Per disk $1
Chip out meter pit or stop box lid in pavement   $150
Clean out meter pit   $300
Clean out stop box   $150
Copies, Paper, Oversized Page Per page $1.25
Copies, Paper, Standard Page Per page $0.25
Delinquent Turn-Off   $50
Distribution Inspection Per linear foot of pipe $3
Per inspection for 1 or 2 hydrants $540
Per inspection for fire hydrants or firelines only $540
Distribution Inspection Overtime Per hour $70
Diversion Charge   $500
Document Preparation (Duplicate or Amended)   $1,000
Drafting Per drawing $265
Easement or Property Occupancy License   $2,000
ERT — Broken/Cut ERT Wire   $70
ERT— Relocation of ERT (Customer Caused)   $150
ERT Sale or Damaged ERT Replacement   $201
Final Meter Reading   $75
High Line Canal Refundable Security Deposit   $2,100
Hydrant Meter Water  Per 1,000 gallons $11.72
Hydrant Penalty Missing Meter Read/Non Sequential Read   $50
Hydrant Permit Per meter, per year $435
Hydrant Violation in a 12-month permit year First violation $500
Second violation $1,000
Third violation $1,500
Illegal Turn-On Fee   $500
Irrigation Review First review $0
All subsequent submittals $450
Manual Payment Transfer Fee   $10
Meter (New Meters) 5/8" $262 + applicable sales tax
¾" $270 + applicable sales tax
1" $312 + applicable sales tax
1 ½" $492 + applicable sales tax
2" $600 + applicable sales tax
1 ½" Irrigation $891 + applicable sales tax
2" Irrigation $997 + applicable sales tax
Neptune T-10 $400 + applicable sales tax
Meter Inspection or Reinspection 1" and smaller $150
1 ½ and 2" $300
2" Fireline $300
3" and over $150
Meter Tampering (including bypass found open)   $500
Meter Test and Calibration (Displacement Meters) 5/8" $70
¾" $70
1" $70
1 ½" $70
2" $70
Meter Test and Calibration (Compound/Turbine Meters) 2" $105
3" $105
4" $105
6" $105
8" and over $105
Meter Test and Calibration (FM Meters) 4" $140
6" $140
8" $140
10" $140
Missed Turn-On   $100
Overtime Tapping Labor (per hour) Per hour $116
Parcel Drawing Preparation Per drawing $265
Photographic Image Digitized from Photographic Print or Negative Per page $1.50
Plan Review Filing Firelines with domestic connections only $450
Plans with < 300' of pipe $450
Plans with > 2,500' of pipe $1,500
Plans with > 300' and < 2,500' of pipe $900
Up to two fire hydrants only $450
Pre-License   $1,000
Processing Fee for Refunds of Meter, SDC and Plan Review Fees   $50
Raise meter inside pit (meter is too low) 5/8-inch service, raise 7 inches to 12 inches $200
3/4-inch service, raise 8 inches to 12 inches $200
1-inch service, raise 10 inches to 12 inches $250
Replace Damaged Meter Plus Cost of New Meter   $70 + cost of new meter
Replace dome and/or adjust up to grade up to 6 inches   $250
Returned Check   $30
Soil Amendment Inspection First inspection/administration fee
$100
Each additional inspection $70
Soil Amendment Winter Deposit   25% of system development charge
Special Events Permit — Hydrants Only   See fees for hydrant-only connections
Special Events Permit — Water Fountains   See fees for water fountain connections
Stop Box and Valve Replacement   $1,300
Stub-In Fees  

$50 = Administrative fee per connection

$80 = Initial stub-in fee per connection

$80 = Annual stub-in fee per connection until converted to a full tap license

$150 = Tapping labor charge per connection for sizes between ¾" and 2"

Suburban Consumption Report   $350
Suburban Sewer Processing Fee   $100
Tap Cut Reimbursement Per individual tap cut Actual cost of severing tap from the main
Tapping Labor ¾" – 2" $150
Temporary Hydrant Permit Fee One month $170
First additional month $100
Second additional month $100
Temporary Tap Deposit   $2,500
Total Service Review   $1,500
Trim vegetation for meter pit/valve access (minor)   No charge
Trim or remove large vegetation for access   Per quotation
Turn-Off by Request   $25
Turn-On   $50
Unauthorized Boot, Slug or Meter Lock Removal   $500
Unauthorized Hydrant Use   $500
Unauthorized Water Use   $500